Epoxy/Urethane Traffic Coatings

  • • Repair all deteriorated concrete
  • • Shotblasted concrete surface and prepare edges as per spec
  • • All joints and vertical transitions caulked using 2 component polyurethane sealant
  • • Apply Primer
  • • Base coat applied by squeegee then back rolled to achieve even mil thickness
  • • Top coat (multi-layer depending on application) is squeegeed on, back rolled to even finish, aggregate is cast in as per spec and then back rolled to encapsulate it in the coating

Concrete Coatings